Pipes WGP (water and gas pipeline) GOST 3262-75

The WGP GOST 3262-75 pipe, the abbreviation of which stands for “water and gas pipeline”, is specially designed for laying water and gas communications. Even in our time, when modern manufacturers offer a huge range of pipes made of different materials, such specialized pipe products made of steel are very popular among construction and repair organizations, enterprises working in the field of housing and communal services.
Prices for WGP pipes:
| Найменування | Марка сталі | Довжина | Ціна грн/т з ПДВ |
| Труба ВГП (ДУ) 15х2,5 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 15х2,8 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 20х2,5 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 20х2,8 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 25х2,8 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 25х3,2 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 32х2,8 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 32х3,2 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 40х3,0 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 40х3,5 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 50х3,0 | 3пс | 6 м | договірна |
| Труба ВГП (ДУ) 50х3,5 | 3пс | 6 м | договірна |
Relevance of the use of pipes of this category:
The high popularity of high-pressure gas pipes made of steel alloys is explained very simply. No matter how exceptional the characteristics of today’s popular pipes made of polymer materials are, their use in many cases is simply not possible. Such cases include, in particular, the installation of the pipeline in the open air, where it will be affected by a lot of negative factors.
It explains the demand for such products and the fact that, according to generally accepted requirements, pipelines for transporting gas and supplying it to consumers can only be made of steel pipes. That is why LPG pipes are simply an irreplaceable material in any gas economy.
How pipes are made:
Carbon steel is the main material from which pipes belonging to the VHP category are manufactured. The technological process of their production consists of the following stages:
- first, steel blanks are prepared – strips, which are long metal strips with the necessary thickness and width parameters;
- then a pipe is formed from the prepared strip, for which special equipment is used;
- the joint formed on the resulting product is welded using electric welding.
Water and gas pipelines (WGP) are available at the metal base of “TK VENUS” LLC.
To contact us: 066 930 2313; (067) 463 89 06
from 8:00 a.m. to 6:00 p.m. (Mon-Fri)
WE ACCEPT ONLINE ORDERS

